Non-Conformance Report (NCR) Format for Road Construction

Project Name: [Insert Project Name]
Location: [Insert Location]
NCR No.: [Insert Unique ID]
Date of Issue: [Insert Date]
Issued By: [Insert Name of AE/CSC]
Contractor: [Insert Contractor Name]
Document Version: 1.0
Approval Authority: [Insert Name/Designation]

1. Non-Conformance Details

  • Date of Detection: [Insert Date]
  • Location/Chainage: [e.g., Chainage 3+200]
  • Description of Non-Conformance: [e.g., “Concrete slump test failed, recorded 120 mm against max. 100 mm”]
  • Standard Violated: [e.g., MoRTH Clause 602, IS: 1199-1959]
  • Severity: [Minor/Major]
  • Evidence: [e.g., Test report no. ABC, photos, lab results]

2. Affected Work Specifications

  • Work Item: [e.g., Cement Concrete Pavement]
  • Specification Reference: [e.g., MoRTH Section 600, IS: 456-2000]
  • Impact on Project: [e.g., Potential for reduced pavement durability]

3. Root Cause Analysis

  • Identified Cause: [e.g., “Excess water added during mixing”]
  • Method of Analysis: [e.g., Review of batching plant records, operator interview]
  • Contributing Factors: [e.g., “Inadequate supervision at batching plant”]

4. Corrective Action Plan

  • Proposed Action: [e.g., “Remove non-compliant concrete, remix with correct water-cement ratio”]
  • Responsible Party: [e.g., Contractor’s Site Engineer]
  • Target Completion Date: [Insert Date]
  • Verification Method: [e.g., Retest slump as per IS: 1199, compressive strength per IS: 516]

5. Preventive Measures

  • Proposed Measures: [e.g., “Implement pre-mix checks, train batching plant operators”]
  • Implementation Plan: [e.g., “Training scheduled for [Date], checklist introduced”]
  • Responsible Party: [e.g., Contractor’s Quality Manager]

6. Stakeholders Involved

NameRoleContact
[e.g., Mr. XYZ][Quality Engineer][Contact Details]
[e.g., Ms. ABC][Site Supervisor][Contact Details]

7. NCR Closure Checklist

  • Corrective Action Implemented: [Yes/No]
  • Verification Completed: [Yes/No]
  • Verification Details: [e.g., “Slump test passed at 80 mm, strength test compliant”]
  • Supporting Documents: [e.g., Test report no. DEF, photos]
  • Date of Verification: [Insert Date]
  • NCR Status: [Open/Closed]
  • Remarks: [e.g., “Work resumed after compliance verified”]

Issuer’s Signature: ___________________________
Contractor’s Acknowledgment: ___________________________
Verifier’s Signature (on Closure): ___________________________
Approval Authority Signature: ___________________________

References:

  • MoRTH Specifications for Road and Bridge Works (5th Revision, 2013)
  • IRC: SP: 57-2018 – Guidelines on Quality Systems for Roads
  • IS: 456-2000 – Plain and Reinforced Concrete
  • IS: 1199-1959 – Methods for Sampling and Analysis of Concrete
  • IS: 516-1959 – Methods for Tests for Strength of Concrete
  • IS: 73-2013 – Paving Bitumen
  • IS: 6241-1971 – Method of Test for Determination of Bitumen Content
  • ISO 9001:2015 – Control of Nonconforming Outputs